Run Meeting: February 23th, 2018

From Tritium Experiments Group
Jump to navigation Jump to search

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

- Smooth running with stable beam at ~22.2uA after recovery from the NL vacuum issue around 4pm. Opportunistic RF recovery for SL also took place during that downtime.

- During swing shift, we took empty cell data while MCC was trying to push for higher current for Hall C.

- 1.25h Downtime starting from 1pm for the cooling fan replacement for 1L22. We had controlled access to take advantage of this downtime: Jessie and techs went down to the Hall, Bill for raster check.

- Back in beam permit and resume data taking at 14:25

- Reached to 10k with He3 and H3 for kin#16.


Raster check: https://logbooks.jlab.org/entry/3537043, https://logbooks.jlab.org/entry/3537195, https://logbooks.jlab.org/entry/3537215


Plan: Back to production mode

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653