Run Meeting: March 1st, 2018
Jump to navigation
Jump to search
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 24h:
Accelerator
- Although it was improved, the number of trips increased yesterday because CEBAF tried to push >55uA to Hall C. They are back to normal.
Swing shift
- data production
- beam off ~1h due to a box supply trip ---> https://logbooks.jlab.org/entry/3540483
Owl shift
- data production
- beam off ~30m due to a cavity failure ---> https://logbooks.jlab.org/entry/3540632
Day shift
- data production
DATA Status
Round VIII. Column 23/24. 2nd Tritium run
Plan:
Continue taking data and extend the columns
EXTRA:
- Monday Beam Studies
- Start 9:00 am
- opportunistic beam.
- FFB (2h)
- Beam OFF
- 'eta' tool devel (2h)
- Optics (3h)
- Beam back 16:00-17:00.
WIND ADVISORY POSSIBLE ISSUE (Chuck Long): in case there is an alarm regarding the gas bottles HUT (not the bottles themselves), just take the key behind the racks and go to the gas bottles shed and press the low pressure button. There is a warning note in the Counting House.
Slides
- Marco Carmignotto Positron rates estimate for Marathon
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653