Run Meeting: Nov 14th, 2018

From Tritium Experiments Group
Jump to navigation Jump to search

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Jason Bane

Summary of past 24h:

  • Beam studies went well for MCC. They were able to reach 900 kilowatts near the end of their beam studies period. After the established beam to the Halls again, we took a short access for Doug to give a walk through.
  • During Swing and owl shift, we received ~10.8 hours of beam.
  • At the end of Owl shift, We switched to the Tritium target.

Current plan for today

  • Continue to take on Tritium!!!
  • Shujie will take over RC.


Future Plans

  • If beam is very good over the next few days, maybe take some data on He3
  • System recovery (8h) on Monday. No beam studies on Tuesday.
  • MCC wants to do some high current runs on the 21st during day shift, up to 40 uA

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934