Run Meeting: Nov 15th, 2018
Jump to navigation
Jump to search
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Shujie Li
Summary of past 24h:
- Accumulating Tritium statistics.Smooth running till MCC took beam away at 1pm.
- System recovery starting from noon. No system recovery on Monday.
- CO2 gas shed pressure went low and switched to a new bottle by itself. (https://logbooks.jlab.org/entry/3626410)
- during the swing MCC noticed the 2L24-6 unstable phase affected our energy spread. It was reset shortly and looks good now. MCC will investigate this issue during the system recovery.
Plan
- Continue taking data on Tritium.
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934