Run Meeting: Nov 15th, 2018

From Tritium Experiments Group
Jump to navigation Jump to search

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Shujie Li

Summary of past 24h:

  • Accumulating Tritium statistics.Smooth running till MCC took beam away at 1pm.
  • System recovery starting from noon. No system recovery on Monday.
  • CO2 gas shed pressure went low and switched to a new bottle by itself. (https://logbooks.jlab.org/entry/3626410)
  • during the swing MCC noticed the 2L24-6 unstable phase affected our energy spread. It was reset shortly and looks good now. MCC will investigate this issue during the system recovery.

Plan

  • Continue taking data on Tritium.


Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934