3:30PM Run Meeting, Counting house meeting room (200C)

RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

- MoMod Studies --> production (Swing Shift)
- Normal operation (Owl Shift)
- Beam down >2h (Excessive halo trips are occurring) (Day Shift)

Swing shift

- Production

Owl shift

- Production

Day shift

- Production until ~10:30
- Jack entered to try to wake up the Right Arm (Controlled Access) https://logbooks.jlab.org/entry/3615276
- Heidi did a short access to check a possible leak in the Helium return line (not us!)
- Hall work finished ~11:30 and beam restored --> Carbon hole --> restored production 3He.
- ~14:45 beam dump diffuser blower tripped (no Hall A beam).
- Right Arm is working

Plan:

- Take data as normal, 3He and 3H


Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934