Difference between revisions of "HRS Optics with saturated Q1"
Jump to navigation
Jump to search
(Created page with "<ol> <li> Multifoil target: <ol> <li> one DIS run without sieve for y-target calibration <li> sieve on, take a long DIS run for theta, phi calibration </ol> <...") |
m |
||
Line 1: | Line 1: | ||
+ | [https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] | ||
+ | |||
<ol> | <ol> | ||
<li> Multifoil target: | <li> Multifoil target: |
Latest revision as of 18:31, 29 November 2017
Back to Installation and Commissioning
- Multifoil target:
- one DIS run without sieve for y-target calibration
- sieve on, take a long DIS run for theta, phi calibration
- Hydrogen target: elastic peak check (move RHRS to a larger angle), and delta scan at +-2%, +-4% of elastic peak