Installation and Configuration
With First Beam (2018-01-11 - 2018-01-12)
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout
- Detector Checkout / Optics
- Optics commissioning HRS Optics Run
- Detector Calibrations (in parallel with other activities once we have the electron data)