Installation and Configuration

From Tritium Experiments Group
Jump to navigation Jump to search

Back to Installation and Commissioning

Target Info

  • Survey, Density, Windows and other Info of the Target link
  • Hall A target gas cell fill pressures and temperatures halog
  • He3 Certification file
  • Hall-A Tritium Target FSD Verification Checklist file

Survey Info

Beam Instrumentation

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link
  • HRS-R
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link