Difference between revisions of "Additional Installation and Commissioning"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
<li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] | <li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] | ||
− | |||
− | |||
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) | <li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) | ||
</ol> | </ol> |
Latest revision as of 20:41, 12 January 2018
Back to 2018 Spring Run Plan Back to Tritium-Main
Installation and Configuration
With First Beam (2018-01-11 - 2018-01-12)
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout
- Detector Checkout / Optics
- Detector Calibrations (in parallel with other activities once we have the electron data)