Difference between revisions of "How-To and Shift Info"

From Tritium Experiments Group
Jump to navigation Jump to search
m
 
(44 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 +
In the process of editing and updating this page. Please contact any of the [https://hallaweb.jlab.org/wiki/index.php/Graduate_Students Tritium Students] for suggestions, ideas, help, or etc.
 +
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
  
=  How-To-HRS (Detailed documentation and troubleshooting)=
+
[[complete guide|Direct link to the entire repository of information.]] (The original version of the current page.)
 
 
 
 
 
 
A [[Instructions for shift takers|shift portal page]] is available with summarized instructions for shift takers.
 
 
 
This page contains a listing of all procedures, including information that may be relevant only in specific cases. This page is obviously in progress; please contribute to it or contact any of the tritium [https://hallaweb.jlab.org/wiki/index.php/Graduate_Students students] with updates.
 
 
 
----
 
=[[How to manage your BTA (for Shift Leader)]]=
 
 
 
Open your browser on an a-onl@aonl machine<br>
 
[1] https://bta/<br>
 
[2] <b>Login your name/pass word</b><br>
 
[3] File->Open Timesheet<br>
 
[4] choose: Hall:A -> Day-> Shift: Owl(or Day/Swing)<br>
 
[5] click "Open"<br>
 
[6] You see the address bar: <br>
 
(Note that NO time specifically required! e.g.:https://bta/experimenter/a/2014-12-16/owl/end=2014_12_16_08_00;start2014_12_16_00_00) -> this will give you error when you save info for MCC<br>
 
<br>
 
Instead, do following
 
  https://bta/experimenter/a/2014-12-16/owl/<br>
 
[7] If you want to edit hour(s), Please click very right "pencil" icon, then make a comment or edit time<br>
 
<font color>DO NOT USE *EDIT ALL* ON THE BOTTOM</FONT><BR>
 
[8] To save your edited info into DATABASE, just click "V" (check-mark) in same place of "pencil" icon<br>
 
[9] When MCC call you for BTA (An hour before your shift end), click "SAVE INFO for MCC"<br>
 
[10] Read number ABU and BANU. (That's it ! This should work !)<br>
 
[11] <b>End of shift, please sign off</b><br>
 
[12] <b>Once you've done, please Logout. </b><br>
 
<table>
 
<tr><td> [[Image:BTA.png|200px|thumb|left|BTA_Snapshot]]</td><td> [[Image:BTA2.png|200px|thumb|left|BTA_Snapshot]]</td>
 
<tr><td> STEP #1</td><td> STEP #2</td>
 
</tr>
 
</table>
 
<br>
 
  
=[https://hallaweb.jlab.org/tech/Detectors/public_html//controls/hall_a/ioc_portserver_reboot_locations.htm ioc_portserver_reboot_locations] =
+
*<B> First!! </B> Please read and sign the safety documentation in the counting house. A readable version can be found [[http://hallaweb.jlab.org/index/safety-docs/current/ here]]!
  
 +
*<B> Second!! </B>  Please sign up for more shifts -- [[https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=TRITON-2017 link]]
  
=[[Troubleshooting]]=
+
<B> Shiftworker Jobs and Responsibilities</B>
* The start and end of run entries do not show up in HALOG:
 
** Make sure you have waited long enough. Automated entries take a while to show up in the HAlog.
 
** You want to quit coda, connect to adaql2 as a-onl using ssh, and restart coda. Yes even if you are already connected on adaql2 as a-onl, the ssh part is what you need here.
 
  
* If you hear an alarm with a very  deep voice, read this [[https://logbooks.jlab.org/entry/3313926 logbook entry.]]
+
*[https://wiki.jlab.org/tegwiki/index.php/ShiftLeader Shift Leader]
 +
**Main point of contact between Run Coordinator/MCC and Shift workers.
 +
**[[Run Plan From Run Coordinator]]
  
 +
*[https://wiki.jlab.org/tegwiki/index.php/TargetOperator Target Operator]
 +
**Operator of Target Ladder
 +
**<B>Person responsible for monitoring the Target System!</B>
  
 +
*[https://wiki.jlab.org/tegwiki/index.php/Third Third Person]
 +
**Person responsible for controlling CODA (how to's will be provided)
 +
**Person responsible for completing Online analysis for detector checks
  
 +
*[https://wiki.jlab.org/tegwiki/index.php/Shiftwork How-tos for other activities during shifts]
  
= [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/shift_worker_info/Howtoes_updated.html  GMP & DVCS How-To]=
+
*[https://wiki.jlab.org/tegwiki/index.php/Experts Experts on call]
= [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/shift_worker_info/Contact.pdf Contact List (to be updated)]=
 
= [[ Tritium-Target How-To (to be added)]]=
 

Latest revision as of 10:35, 7 February 2018

In the process of editing and updating this page. Please contact any of the Tritium Students for suggestions, ideas, help, or etc.

Back to Tritium-Main

Direct link to the entire repository of information. (The original version of the current page.)

  • First!! Please read and sign the safety documentation in the counting house. A readable version can be found [here]!
  • Second!! Please sign up for more shifts -- [link]

Shiftworker Jobs and Responsibilities

  • Target Operator
    • Operator of Target Ladder
    • Person responsible for monitoring the Target System!
  • Third Person
    • Person responsible for controlling CODA (how to's will be provided)
    • Person responsible for completing Online analysis for detector checks