Difference between revisions of "How-To and Shift Info"

From Tritium Experiments Group
Jump to navigation Jump to search
m
 
(39 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 +
In the process of editing and updating this page. Please contact any of the [https://hallaweb.jlab.org/wiki/index.php/Graduate_Students Tritium Students] for suggestions, ideas, help, or etc.
 +
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
  
=  How-To-HRS (Detailed documentation and troubleshooting)=
+
[[complete guide|Direct link to the entire repository of information.]] (The original version of the current page.)
 
 
 
 
 
 
A [[Instructions for shift takers|shift portal page]] is available with summarized instructions for shift takers.
 
 
 
This page contains a listing of all procedures, including information that may be relevant only in specific cases.  This page is obviously in progress; please contribute to it or contact any of the  [https://hallaweb.jlab.org/wiki/index.php/Graduate_Students tritium students] with updates.
 
 
 
----
 
=How to manage your BTA (for Shift Leader)=
 
 
 
Open your browser on an a-onl@aonl machine<br>
 
[1] https://bta/<br>
 
[2] <b>Login your name/pass word</b><br>
 
[3] File->Open Timesheet<br>
 
[4] choose: Hall:A -> Day-> Shift: Owl(or Day/Swing)<br>
 
[5] click "Open"<br>
 
[6] You see the address bar: <br>
 
(Note that NO time specifically required! e.g.:https://bta/experimenter/a/2014-12-16/owl/end=2014_12_16_08_00;start2014_12_16_00_00) -> this will give you error when you save info for MCC<br>
 
<br>
 
Instead, do the following
 
  https://bta/experimenter/a/2014-12-16/owl/<br>
 
[7] If you want to edit hour(s), Please click very right "pencil" icon, then make a comment or edit time<br>
 
<font color>DO NOT USE *EDIT ALL* ON THE BOTTOM</FONT><BR>
 
[8] To save your edited info into DATABASE, just click "V" (check-mark) in same place of "pencil" icon<br>
 
[9] When MCC call you for BTA (An hour before your shift end), click "SAVE INFO for MCC"<br>
 
[10] Read number ABU and BANU. (That's it ! This should work !)<br>
 
[11] <b>End of shift, please sign off</b><br>
 
[12] <b>Once you've done, please Logout. </b><br>
 
<table>
 
<tr><td> [[Image:BTA.png|200px|thumb|left|BTA_Snapshot]]</td><td> [[Image:BTA2.png|200px|thumb|left|BTA_Snapshot]]</td>
 
<tr><td> STEP #1</td><td> STEP #2</td>
 
</tr>
 
</table>
 
<br>
 
 
 
=[https://hallaweb.jlab.org/tech/Detectors/public_html//controls/hall_a/ioc_portserver_reboot_locations.htm ioc_portserver_reboot_locations] =
 
 
 
 
 
=Troubleshooting=
 
* The start and end of run entries do not show up in HALOG:
 
** Make sure you have waited long enough. Automated entries take a while to show up in the HAlog.
 
** You want to quit coda, connect to adaql2 as a-onl using ssh, and restart coda. Yes even if you are already connected on adaql2 as a-onl, the ssh part is what you need here.
 
 
 
* If you hear an alarm with a very  deep voice, read this [[https://logbooks.jlab.org/entry/3313926 logbook entry.]]
 
 
 
= Beam Recovery Procedure =
 
 
 
Update: October 24, 2010.
 
* Empty target, establish correct beam position</li>
 
** 5 uA empty target
 
** BPM4A (X,Y) = ( 0.0, 0.0) mm
 
** BPM4B (X,Y) = ( 0.0, 0.0) mm
 
** See white board for updates on these.
 
** Tolerances on these : +/- 0.3 mm
 
* In standard configuration we run without the raster (ok on cryotarget if beam current is less than 5uA)
 
* Put in BeO target, for visual check of spot (if camera still works)
 
** 10 uA rastered beam on BeO.
 
 
 
=Data Acquisition=
 
==Basic Data Acquisition with CODA (updated 11/3)==
 
 
 
This assumes runcontrol is already up.  If not, go to [[#Starting CODA From Scratch | Starting CODA From Scratch]] below.
 
 
 
Need to add a description of what/how the data taking process will occur!
 
 
 
*''' How to run DAQ on LEFT HRS:'''
 
** From a terminal login as "'''adaq'''" on '''adaq1''' machine (do "'''ssh adaq@adaq1'''" without the quotes)
 
** Password is available on the white board
 
** After login to adaq1, type "'''startcoda'''" to bring up the runcontrol GUI
 
** The default configuration is "''' ????'''", if it is not loaded you can choose it from the menu "'''configurations->Cool'''", select "'''????'''"
 
** Click "'''Platform->connect'''"
 
** Click on "'''Download'''" button
 
** Click on "'''Start (>>)'''" button, and acknowledge '''"start-of-run"''' pop-up window
 
** To end a run click on '''"End"''' button
 
  
 +
*<B> First!! </B> Please read and sign the safety documentation in the counting house. A readable version can be found [[http://hallaweb.jlab.org/index/safety-docs/current/ here]]!
  
*''' How to run DAQ on RIGHT HRS:'''
+
*<B> Second!! </B> Please sign up for more shifts -- [[https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=TRITON-2017 link]]
** From a terminal login as "'''adaq'''" on '''adaq2''' machine (do "'''ssh adaq@adaq2'''" without the quotes)
 
** Password is available on the white board
 
** After login to adaq2, type "'''startcoda'''" to bring up the runcontrol GUI
 
** The default configuration is "'''?????'''", if it is not loaded you can choose it from the menu "'''configurations->Cool'''", select "'''?????'''"
 
** Click "'''Platform->connect'''"
 
** Click on "'''Download'''" button
 
** Click on "'''Start (>>)'''" button, and acknowledge the '''"start-of-run"''' pop-up window
 
** To end a run click on '''"End"''' button
 
  
 +
<B> Shiftworker Jobs and Responsibilities</B>
  
* '''How to kill coda processes'''
+
*[https://wiki.jlab.org/tegwiki/index.php/ShiftLeader Shift Leader]
** At the terminal of '''adaq1''' (for LHRS) or '''adaq2''' (for RHRS), type '''"kcoda"'''.  
+
**Main point of contact between Run Coordinator/MCC and Shift workers.
 +
**[[Run Plan From Run Coordinator]]
  
 +
*[https://wiki.jlab.org/tegwiki/index.php/TargetOperator Target Operator]
 +
**Operator of Target Ladder
 +
**<B>Person responsible for monitoring the Target System!</B>
  
 +
*[https://wiki.jlab.org/tegwiki/index.php/Third Third Person]
 +
**Person responsible for controlling CODA (how to's will be provided)
 +
**Person responsible for completing Online analysis for detector checks
  
= [Contact List (to be updated)]=
+
*[https://wiki.jlab.org/tegwiki/index.php/Shiftwork How-tos for other activities during shifts]
[https://hallaweb.jlab.org/wiki/index.php/Graduate_Students Graduate Students]
 
  
= [[ Tritium-Target How-To (to be added)]]=
+
*[https://wiki.jlab.org/tegwiki/index.php/Experts Experts on call]

Latest revision as of 10:35, 7 February 2018

In the process of editing and updating this page. Please contact any of the Tritium Students for suggestions, ideas, help, or etc.

Back to Tritium-Main

Direct link to the entire repository of information. (The original version of the current page.)

  • First!! Please read and sign the safety documentation in the counting house. A readable version can be found [here]!
  • Second!! Please sign up for more shifts -- [link]

Shiftworker Jobs and Responsibilities

  • Target Operator
    • Operator of Target Ladder
    • Person responsible for monitoring the Target System!
  • Third Person
    • Person responsible for controlling CODA (how to's will be provided)
    • Person responsible for completing Online analysis for detector checks