Difference between revisions of "Run Meeting: February 23th, 2018"
(Created page with "Back to Main Page Daily_Run_Meetings 4:00PM Run Meeting, Counting house meeting room (200C) Summary of past 24h: Plan: ===Slides=== BlueJeans connecti...") |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
Summary of past 24h: | Summary of past 24h: | ||
+ | - Smooth running with stable beam at ~22.2uA after recovery from the NL vacuum issue around 4pm. Opportunistic RF recovery for SL also took place during that downtime. | ||
− | Plan: | + | - During swing shift, we took empty cell data while MCC was trying to push for higher current for Hall C. |
+ | |||
+ | - 1.25h Downtime starting from 1pm for the cooling fan replacement for 1L22. We had controlled access to take advantage of this downtime: Jessie and techs went down to the Hall, Bill for raster check. | ||
+ | |||
+ | - Back in beam permit and resume data taking at 14:25 | ||
+ | |||
+ | - Reached to 10k with He3 and H3 for kin#16. | ||
+ | |||
+ | |||
+ | Raster check: https://logbooks.jlab.org/entry/3537043, https://logbooks.jlab.org/entry/3537195, https://logbooks.jlab.org/entry/3537215 | ||
+ | |||
+ | |||
+ | Plan: Back to production mode | ||
===Slides=== | ===Slides=== | ||
+ | Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | ||
BlueJeans connection info: | BlueJeans connection info: |
Latest revision as of 15:13, 23 February 2018
Back to Main Page Daily_Run_Meetings
4:00PM Run Meeting, Counting house meeting room (200C)
Summary of past 24h:
- Smooth running with stable beam at ~22.2uA after recovery from the NL vacuum issue around 4pm. Opportunistic RF recovery for SL also took place during that downtime.
- During swing shift, we took empty cell data while MCC was trying to push for higher current for Hall C.
- 1.25h Downtime starting from 1pm for the cooling fan replacement for 1L22. We had controlled access to take advantage of this downtime: Jessie and techs went down to the Hall, Bill for raster check.
- Back in beam permit and resume data taking at 14:25
- Reached to 10k with He3 and H3 for kin#16.
Raster check: https://logbooks.jlab.org/entry/3537043, https://logbooks.jlab.org/entry/3537195, https://logbooks.jlab.org/entry/3537215
Plan: Back to production mode
Slides
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653