Difference between revisions of "Run Meeting: March 1st, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 7: Line 7:
  
 
==Summary of past 24h:==
 
==Summary of past 24h:==
 +
 +
'''Accelerator'''
 +
:Although it was improved, the number of trips increased yesterday because CEBAF tried to push >55uA to Hall C. They are back to normal.
 +
 
'''Swing shift'''
 
'''Swing shift'''
 +
:data production
 +
:beam off ~1h due to a box supply trip ---> https://logbooks.jlab.org/entry/3540483
  
 
'''Owl shift'''  
 
'''Owl shift'''  
 +
:data production
 +
:beam off ~30m due to a cavity failure ---> https://logbooks.jlab.org/entry/3540632
  
'''Day shift'''  
+
'''Day shift'''
 
 
  
 
==Plan:==
 
==Plan:==

Revision as of 09:19, 1 March 2018

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

Although it was improved, the number of trips increased yesterday because CEBAF tried to push >55uA to Hall C. They are back to normal.

Swing shift

data production
beam off ~1h due to a box supply trip ---> https://logbooks.jlab.org/entry/3540483

Owl shift

data production
beam off ~30m due to a cavity failure ---> https://logbooks.jlab.org/entry/3540632

Day shift

Plan:

Continue taking data and extend the columns

EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.


Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653