Difference between revisions of "Run Meeting: March 1st, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 47: Line 47:
 
:Beam back 16:00-17:00.
 
:Beam back 16:00-17:00.
  
<span style=color:red>WIND ADVISORY POSSIBLE ISSUE (Chuck Long):</span> in case there is an alarm regarding the gas bottles, just take the key behind the racks and go to the gas bottles go to the shed and press the low pressure button. There is a warning note in the Counting House.  
+
<span style=color:red>WIND ADVISORY POSSIBLE ISSUE (Chuck Long):</span> in case there is an alarm regarding the gas bottles, just take the key behind the racks and go to the gas bottles shed and press the low pressure button. There is a warning note in the Counting House.  
  
 
===Slides===
 
===Slides===

Revision as of 16:57, 1 March 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

Although it was improved, the number of trips increased yesterday because CEBAF tried to push >55uA to Hall C. They are back to normal.

Swing shift

data production
beam off ~1h due to a box supply trip ---> https://logbooks.jlab.org/entry/3540483

Owl shift

data production
beam off ~30m due to a cavity failure ---> https://logbooks.jlab.org/entry/3540632

Day shift

data production


DATA Status

Round VIII. Column 23/24. 2nd Tritium run

Plan:

Continue taking data and extend the columns

EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.

WIND ADVISORY POSSIBLE ISSUE (Chuck Long): in case there is an alarm regarding the gas bottles, just take the key behind the racks and go to the gas bottles shed and press the low pressure button. There is a warning note in the Counting House.

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653