Difference between revisions of "Fall Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
m
Line 20: Line 20:
  
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (regular)
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (regular)
 
+
<ol>
 
<li> [[New Trigger Checkout]]
 
<li> [[New Trigger Checkout]]
 +
</ol>
  
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] (regular)
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] (regular)
 +
<ol>
 
<li> [[New Detector / Optics Checkout]]
 
<li> [[New Detector / Optics Checkout]]
 
+
</ol>
 
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) (regular)
 
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) (regular)
 
+
<ol>
 
<li> [[New Detector Calibration]]
 
<li> [[New Detector Calibration]]
 
+
</ol>
 
</ol>
 
</ol>

Revision as of 12:20, 13 August 2018

Back to Tritium-Main Back to 2018 Fall Run Plan

  • We can link to the list tasks during the Spring 2018 run
  • Create new Installation and Commissioning plan here.

Installation and Configuration

With First Beam (2019-09-04 - 2019-09-10)

  1. Beamline
    1. Beam Centering
    2. Raster Size Calibration
    3. BPM Calibration (pedestal run, Bullseye scan)
    4. ARC Energy Measurement (parasitic only)
  2. DAQ and Trigger Checkout (regular)
    1. New Trigger Checkout
  3. Detector Checkout / Optics (regular)
    1. New Detector / Optics Checkout
  4. Detector Calibrations (in parallel with other activities once we have the electron data) (regular)
    1. New Detector Calibration