Difference between revisions of "New Installation and Configuration"
Jump to navigation
Jump to search
(Created page with "[https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] ==Target Info == * Survey, Density, Windows...") |
m |
||
Line 1: | Line 1: | ||
− | [https://wiki.jlab.org/tegwiki/index.php/ | + | [https://wiki.jlab.org/tegwiki/index.php/Fall_Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] |
==Target Info == | ==Target Info == |
Revision as of 11:24, 13 August 2018
Back to Installation and Commissioning
Target Info
- Survey, Density, Windows and other Info of the Target [https:// link]
- Hall A target gas cell fill pressures and temperatures [https:// halog]
- He3 Certification [https:// file]
- Hall-A Tritium Target FSD Verification Checklist [https:// file]
Survey Info
Beam Instrumentation
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
17 | 09/04/2018 | SRC | xxxx ~ xxxx | link |
- HRS-R
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
17 | 09/04/2018 | SRC | xxxx ~ xxxx | link |