Difference between revisions of "Fall Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 13: Line 13:
 
<li> Beamline
 
<li> Beamline
 
  <ol>
 
  <ol>
   <li> [[Beam Centering]]
+
   <li> [[Beam Centering]] (standard)
   <li> [[Raster Size Calibration]]
+
   <li> [[Raster Size Calibration]] (standard)
 +
  <li> [[ARC Energy Measurement]] (standard, parasitic only)
 
   <li> [[Fall2018 BPM Calibration]] [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration] (pedestal run, Bullseye scan)
 
   <li> [[Fall2018 BPM Calibration]] [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration] (pedestal run, Bullseye scan)
  <li> [[ARC Energy Measurement]] (parasitic only)
 
 
  </ol>
 
  </ol>
  

Revision as of 15:03, 21 September 2018

Back to Tritium-Main Back to 2018 Fall Run Plan

  • We can link to the list tasks during the Spring 2018 run
  • Create new Installation and Commissioning plan here.

New Installation and Configuration

With First Beam (2019-09-04 - 2019-09-10)

  1. Beamline
    1. Beam Centering (standard)
    2. Raster Size Calibration (standard)
    3. ARC Energy Measurement (standard, parasitic only)
    4. Fall2018 BPM Calibration See Spring2018 BPM Calibration (pedestal run, Bullseye scan)
  2. DAQ and Trigger Checkout (regular)
    1. New SRC DAQ and Trigger Checkout
    2. New ee'K DAQ and Trigger Checkout
  3. Detector Checkout / Optics (regular)
    1. Aerogel Cherenkov Detector Checkout
    2. Gas Cherenkov Detector Checkout
    3. New Optics Checkout
  4. Detector Calibrations (in parallel with other activities once we have the electron data) (regular)
    1. Aerogel Cherenkov Detector Calibration
    2. Gas Cherenkov Detector Calibration