Line 16: Line 16:
 
===ERR===  
 
===ERR===  
 
*PCS
 
*PCS
** The new magnet PCS has been arrived at JLab.  
+
** The new magnet PCS has been arrived at JLab last month.  
 
**  
 
**  
  
 
*Target  
 
*Target  
** 10 meetings with Dave were held since Dec 2020. <br> &rarr; We have consensus for the basic design. But, man power is needed for the detailed design. <br> It would take for ~3 months for design + ~1 year for construction. <br> <font color="green">We would like to ask for man power assignment at least for target design (+ safety assessment etc.) for ERR. </font>
+
** 10 meetings with Dave were held since Dec 2020. <br> &rarr; We have consensus for the basic design. <br> &rarr; But, man power is needed for the detailed design.  
 +
** It would take for ~3 months for design + ~1 year for construction. <br> &rarr; <font color="green">We would like to ask for man power assignment at least for target design (+ safety assessment etc.) <br>  for ERR (Oct 2022 ~ in the beginning of 2023). </font>
 
** Gas + motion systems will be similar to those of PREX/CREX.  
 
** Gas + motion systems will be similar to those of PREX/CREX.  
 
** Dedicated scattering chamber is necessary  
 
** Dedicated scattering chamber is necessary  

Revision as of 08:09, 25 March 2022

Strategy Meeting

Info

  • 21:00-22:00 on Feb 24, 2022 (JST)
  • via Zoom


Discussion

Possible time line

  • 2024-26?

PAC presentation

  • Do we need a presentation?

ERR

  • PCS
    • The new magnet PCS has been arrived at JLab last month.
  • Target
    • 10 meetings with Dave were held since Dec 2020.
      → We have consensus for the basic design.
      → But, man power is needed for the detailed design.
    • It would take for ~3 months for design + ~1 year for construction.
      We would like to ask for man power assignment at least for target design (+ safety assessment etc.)
       for ERR (Oct 2022 ~ in the beginning of 2023).
    • Gas + motion systems will be similar to those of PREX/CREX.
    • Dedicated scattering chamber is necessary
    • Target design is basically independent from experimental halls, A or C.
      But, the cryogenic systems would be easier at Hall C.

Report

  • Okuyama's presentation file in a workshop HIEI2022 (Mar 22, 2022)
    → Geant4 simulation for the next experiment PDF


Next Meeting