*Target | *Target | ||
− | ** 10 meetings with Dave have been held since Dec 2020. <br> → We have a consensus for the basic design. <br> → But, man power is needed for the detailed design. | + | ** 10 meetings with Dave have been held since Dec 2020. <br> → We have a consensus for the basic conceptual design. <br> → But, man power is needed for the detailed design. |
** It would take for ~3 months for design + ~1 year for construction. <br> → <font color="green">We would like to ask for man power assignment at least for target design (+ safety assessment etc.) <br> for ERR (Oct 2022 ~ in the beginning of 2023). </font> | ** It would take for ~3 months for design + ~1 year for construction. <br> → <font color="green">We would like to ask for man power assignment at least for target design (+ safety assessment etc.) <br> for ERR (Oct 2022 ~ in the beginning of 2023). </font> | ||
** Gas + motion systems will be similar to those of PREX/CREX. | ** Gas + motion systems will be similar to those of PREX/CREX. |
Revision as of 08:39, 25 March 2022
Strategy Meeting (JLab Hypernuclear Epxeriment)
Info
- 22:00- on Mar 25, 2022 (JST)
- via Zoom
Discussion
Possible time line
- 2024-26?
PAC presentation
- Do we need a presentation?
ERR
- PCS
- The new magnet PCS has been arrived at JLab last month.
- Sometime in this summer.
- Target
- 10 meetings with Dave have been held since Dec 2020.
→ We have a consensus for the basic conceptual design.
→ But, man power is needed for the detailed design. - It would take for ~3 months for design + ~1 year for construction.
→ We would like to ask for man power assignment at least for target design (+ safety assessment etc.)
for ERR (Oct 2022 ~ in the beginning of 2023). - Gas + motion systems will be similar to those of PREX/CREX.
- Dedicated scattering chamber is necessary
- Target design is basically independent from experimental halls, A or C.
But, the cryogenic systems would be easier at Hall C.
- 10 meetings with Dave have been held since Dec 2020.
Report
- Simulation study
- One page summary from Sho → PDF
- (Reference →) Okuyama's presentation file in a workshop HIEI2022 (Mar 22, 2022)
→ Okuyama_HIEI2022.pdf (Geant4 simulation for the next experiment)
Next Meeting