==Info==
* 21:00- on June 1, 2022 (JST)
+
* 21:00-22:10 on June 1, 2022 (JST)
 
* Nue, Liguang, Joerg, Pete, Franco, Guido, Sho, Toshi
 
* Nue, Liguang, Joerg, Pete, Franco, Guido, Sho, Toshi
 
* via Zoom
 
* via Zoom
Line 15: Line 15:
 
* Accidental background needs to be updated, <br> taking into account acc. events that could be remained even after the z vertex cut. <br> &rarr; z vertex consistency between left and right spectrometers will be not able to be done if only HES is vertical <br> &rarr; This effect may be evaluated from the tritium data.
 
* Accidental background needs to be updated, <br> taking into account acc. events that could be remained even after the z vertex cut. <br> &rarr; z vertex consistency between left and right spectrometers will be not able to be done if only HES is vertical <br> &rarr; This effect may be evaluated from the tritium data.
  
===Letter to JLab (Nue)===
+
===A Letter to JLab (Nue)===
 +
* Additional items to be included
 +
** Sieve slit + collimator
 +
** Corrector magnet for the beam
 +
 
 +
* ERR &larr; We need to keep our mind that we need to prepare documents for every conponent.
 +
 
 +
 
 +
==Next==
 +
* June 14, 2022
  
 
<br><br>
 
<br><br>
 
<hr>
 
<hr>
 
<font size="4">[[HYP_HRS-HKS | Back to Home (Hypernuclear project with HRS-HKS)]]</font>
 
<font size="4">[[HYP_HRS-HKS | Back to Home (Hypernuclear project with HRS-HKS)]]</font>

Latest revision as of 09:26, 1 June 2022

Strategy Meeting (JLab Hypernuclear Epxeriment)

Info

  • 21:00-22:10 on June 1, 2022 (JST)
  • Nue, Liguang, Joerg, Pete, Franco, Guido, Sho, Toshi
  • via Zoom

Discussion

About Pb (Guido)

  • Simulation is in progress.

Expected spectra for 3,4H_Lambda (Gogami)

JLabMeeting 20220601 gogami.pdf

  • At least, two times longer beam time is needed for the gas target in Hall C.
  • Accidental background needs to be updated,
    taking into account acc. events that could be remained even after the z vertex cut.
    → z vertex consistency between left and right spectrometers will be not able to be done if only HES is vertical
    → This effect may be evaluated from the tritium data.

A Letter to JLab (Nue)

  • Additional items to be included
    • Sieve slit + collimator
    • Corrector magnet for the beam
  • ERR ← We need to keep our mind that we need to prepare documents for every conponent.


Next

  • June 14, 2022