Difference between revisions of "Hyp-StraMeeting 20241023"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(10 intermediate revisions by the same user not shown)
Line 10: Line 10:
 
* Status of the document <br> &rarr; https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit?tab=t.0
 
* Status of the document <br> &rarr; https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit?tab=t.0
 
* Agenda <br> &rarr; https://hallcweb.jlab.org/wiki/index.php/ERR_Hypernuclear
 
* Agenda <br> &rarr; https://hallcweb.jlab.org/wiki/index.php/ERR_Hypernuclear
* ENGE system (Sho)
+
* ENGE system
 
** New vacuum box ? &rarr; Yes, we need to have a new vacuum box made by JLab.
 
** New vacuum box ? &rarr; Yes, we need to have a new vacuum box made by JLab.
 
** Signal connectors from the vacuum to outside <br> &rarr; Vacuum test is necessary.  
 
** Signal connectors from the vacuum to outside <br> &rarr; Vacuum test is necessary.  
 
** A sketch will be prepared
 
** A sketch will be prepared
 +
** Scintillator fibers &rarr; MPPCs (+circuits) &rarr; VME-EASIROC modules <br> &rarr; <font color="red">Is the VME-EASIROC OK for radiation level? </font> ENGE is close to the target area, and the radiation may be high.<br> &rarr; There is an existing bunker for electronics (Bill). It would be better to consider testing the VME-EASIROC modules before the experiment.
 +
* &alpha; source
 +
** &sim; 1kBq <br> &rarr; 1000 counts assuming 1 hour data with 4 msr acceptance.
 +
** 20 keV energy uncertainty
 +
** Three &alpha; lines
 +
** Liguang will show the source information to Mark
 +
*Manpower
  
 
===Others===
 
===Others===

Latest revision as of 09:56, 23 October 2024

Strategy Meeting on Oct 23, 2024

Information

  • Time and Date: 22:00-23:00 on Oct 23, 2024 (JST)
  • Participants: Franco, Gudio, Nue, Pete, Sho, Bill, Joerg, Liguang, Toshi
  • Place: Zoom

Content

ERR

  • Status of the document
    https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit?tab=t.0
  • Agenda
    https://hallcweb.jlab.org/wiki/index.php/ERR_Hypernuclear
  • ENGE system
    • New vacuum box ? → Yes, we need to have a new vacuum box made by JLab.
    • Signal connectors from the vacuum to outside
      → Vacuum test is necessary.
    • A sketch will be prepared
    • Scintillator fibers → MPPCs (+circuits) → VME-EASIROC modules
      Is the VME-EASIROC OK for radiation level? ENGE is close to the target area, and the radiation may be high.
      → There is an existing bunker for electronics (Bill). It would be better to consider testing the VME-EASIROC modules before the experiment.
  • α source
    • ∼ 1kBq
      → 1000 counts assuming 1 hour data with 4 msr acceptance.
    • 20 keV energy uncertainty
    • Three α lines
    • Liguang will show the source information to Mark
  • Manpower

Others

Next Meeting

  • 22:00 on Oct X, 2024 (JST)



Back to Home