Line 14: | Line 14: | ||
==Discussion== | ==Discussion== | ||
Discussion with Zhihong's slides | Discussion with Zhihong's slides | ||
− | *Raster | + | *'''Raster''' |
− | Doug will get an update from Bill Gunning | + | -Doug will get an update from Bill Gunning |
− | follow up with possible updates/repair to prevent frequent accesses during tritium running | + | -follow up with possible updates/repair to prevent frequent accesses during tritium running |
− | *HRS | + | *'''HRS''' |
'''HRS momentum limitations''' | '''HRS momentum limitations''' | ||
− | priorities for Jack's time from now until running | + | -priorities for Jack's time from now until running |
− | get update from Jack on current status/limitations on HRS magnets | + | -get update from Jack on current status/limitations on HRS magnets |
− | Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit | + | -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit |
'''Cooling Co-dependence, tripping HRS magnets''' | '''Cooling Co-dependence, tripping HRS magnets''' | ||
− | for tritium running will cooling systems be pushed to the limit? (3-4 hall running?) | + | -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?) |
− | *DAQ | + | *'''DAQ''' |
− | need to decide on final trigger settings for (e'p). (argon will use same trigger) | + | -need to decide on final trigger settings for (e'p). (argon will use same trigger) |
− | students should get familiar with installed electronics, cable maps, etc. | + | -students should get familiar with installed electronics, cable maps, etc. |
− | John will send out (e'p) trigger proposal next week | + | -John will send out (e'p) trigger proposal next week |
− | parallel NIM and MLU trigger decisions, both sent to TS | + | -parallel NIM and MLU trigger decisions, both sent to TS |
− | *Scintillator | + | *'''Scintillator''' |
'''S0''' | '''S0''' | ||
− | there wasn't an acceptance issue for GMp | + | -there wasn't an acceptance issue for GMp |
− | will the S0 frame generate too many pions? (for Marathon) | + | -will the S0 frame generate too many knocked-out electrons from pions that can create electron-like triggers? (for Marathon) |
− | need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon | + | -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon |
Latest revision as of 22:45, 17 January 2017
Back to Main Page >> Analysis Meetings >> Pre-experiment
Instructions
Agenda
- Example (slides)
Attendance
Onsite: Phone:
Discussion
Discussion with Zhihong's slides
- Raster
-Doug will get an update from Bill Gunning -follow up with possible updates/repair to prevent frequent accesses during tritium running
- HRS
HRS momentum limitations -priorities for Jack's time from now until running -get update from Jack on current status/limitations on HRS magnets -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
Cooling Co-dependence, tripping HRS magnets -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
- DAQ
-need to decide on final trigger settings for (e'p). (argon will use same trigger) -students should get familiar with installed electronics, cable maps, etc. -John will send out (e'p) trigger proposal next week -parallel NIM and MLU trigger decisions, both sent to TS
- Scintillator
S0 -there wasn't an acceptance issue for GMp -will the S0 frame generate too many knocked-out electrons from pions that can create electron-like triggers? (for Marathon) -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon