Difference between revisions of "Run Meeting: April 18th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page with "'''Back to:''' : Main Page : Daily Run Meetings 4:00PM Run Meeting, Counting house meeting room (200C) '''RC:''' Florian Hauenstein [h...")
 
 
Line 12: Line 12:
  
 
==e'p==
 
==e'p==
Very stable beam through swing and owl. We were collecting about 2h dummy data and a total of 580mC on He3 and 740mC on Tritium.
+
Very stable beam. Collected charge on tritium is 1.1C and He3 1.15C in slow kinematics
Today is RF recovery and we will get the survey of the spectrometer, a walkthrough from Doug and the postponed BCM calibration.
+
During swing yesterday took BCM calibration run with very stable beam (see beam chart https://logbooks.jlab.org/entry/3562570)
 
 
For the swing and owl it is planned to do finally the postponed BCM calibration.
 
  
 
==Slides==
 
==Slides==

Latest revision as of 13:17, 18 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Florian Hauenstein

(shifts)


e'p

Very stable beam. Collected charge on tritium is 1.1C and He3 1.15C in slow kinematics During swing yesterday took BCM calibration run with very stable beam (see beam chart https://logbooks.jlab.org/entry/3562570)

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653