Difference between revisions of "2018 REU Project"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page with " =Research Plan= *Work through 'Go Board' tutorials at [https://www.nandland.com/goboard/setting-up-environment-icecube.html nandland.com] *Clone and look through the existing...")
 
 
Line 1: Line 1:
 +
[https://wiki.jlab.org/tegwiki/index.php/V1495_Info Back to V1495_Info]
  
 
=Research Plan=
 
=Research Plan=
Line 13: Line 14:
 
*Write up project and results (short paper? poster?)
 
*Write up project and results (short paper? poster?)
  
 +
===Bonus (If time allows)===
 +
*Write simple GUI interface for configuring random trigger
 +
 +
 +
=Daily Log=
 +
(Post notes, results, tables, plots, etc. here for future reference)
 +
 +
===May 30th===
 +
*
  
==Bonus (If time allows)==
+
===May 31st===
*Write simple GUI interface for configuring random trigger
+
*
 +
 
 +
===June 1st===
 +
*

Latest revision as of 11:10, 29 May 2018

Back to V1495_Info

Research Plan

  • Work through 'Go Board' tutorials at nandland.com
  • Clone and look through the existing code git repo
  • Replace complicated random pulser with simple 'true stochastic' pulser
    • Simulate, simulate, simulate
    • implement and test
  • Discuss with BCM expert about BCM signal format
  • Write VHDL module to read-in BCM signal
    • Simulate, simulate, simulate
    • implement and test
  • Connect real BCM signal, test again
  • Write up project and results (short paper? poster?)

Bonus (If time allows)

  • Write simple GUI interface for configuring random trigger


Daily Log

(Post notes, results, tables, plots, etc. here for future reference)

May 30th

May 31st

June 1st