Difference between revisions of "Hyp-StraMeeting 20211202"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
==Discussion== | ==Discussion== | ||
− | * Hall C | + | * Hall C option |
** We need to evaluate how long time we need in the case of Hall C. | ** We need to evaluate how long time we need in the case of Hall C. | ||
** Consideration of the use of SHMS | ** Consideration of the use of SHMS | ||
Line 14: | Line 14: | ||
*** Yield may be compatible to PCS+HES+HKS | *** Yield may be compatible to PCS+HES+HKS | ||
+ | * Cost for the spectrometer modification to vertical.<br> → Franco will ask Paul. | ||
Latest revision as of 10:55, 2 December 2021
Strategy Meeting
Info
- 21:00- on Dec 02, 2021 (JST)
- Liguang, Joerg, Pete, Nue, Franco, Guido, Sho, Gogami
- via BlueJeans
Discussion
- Hall C option
- We need to evaluate how long time we need in the case of Hall C.
- Consideration of the use of SHMS
- S/N
- Yield may be compatible to PCS+HES+HKS
- Cost for the spectrometer modification to vertical.
→ Franco will ask Paul.