Line 14: | Line 14: | ||
*** PCS test (+ existing power supplies) at JLab prior to the experiment<br> → where/how/when/what to test? | *** PCS test (+ existing power supplies) at JLab prior to the experiment<br> → where/how/when/what to test? | ||
** Target | ** Target | ||
− | *** | + | *** Possible dimension of CH<sub>2</sub> will be clarified by us |
− | <br> → | + | *** Necessary targets are already shown in ERR |
+ | ** <sup>48</sup>Ca has not purchased yet. | ||
+ | ** Detector spares? | ||
+ | *** Counters <br> → Should be OK. | ||
+ | *** Drift chambers<br> - No spare exists so far (→ Liguang will look for them). <br> → A plan to fix possible problems is necessary. | ||
+ | *** Fiber detector for ENGE | ||
+ | ** LCW → Steven's group will care. | ||
+ | ** EPICS | ||
+ | *** Beam momentum centroid etc. | ||
+ | ** Possible risks and ways to mitigate damages. | ||
+ | ** Beam commissioning | ||
+ | ** Manpower | ||
+ | ** Documents → A draft of each document needs to be developed. |
Latest revision as of 09:30, 5 December 2024
Strategy Meeting (Hypernuclear Experiment)
Information
- Time and Date: 22:00 on Dec 5, 2024
- Participants: Joerg, Nue, Liguang, Pete, Sho, Guido, Toshi
- Place: Zoom
Contents
ERR
- The first ERR was done
- Discussion for reactions to the ERR report
- Radiation calculations will be done by Tokyo group by using FULKA and Geant4.
→ Sho installed FULKA in his laptop, and obtained a sample code for HKS from Pavel.
→ Sho will share the FULKA code with us, and Guido will work on it as well.
→ At first, we are going to ask Pavel to create the first code based on the latest design. - PCS
- English documents are not fully ready or are not in hand of JLab (reviewer etc).
- PCS test (+ existing power supplies) at JLab prior to the experiment
→ where/how/when/what to test?
- Target
- Possible dimension of CH2 will be clarified by us
- Necessary targets are already shown in ERR
- 48Ca has not purchased yet.
- Detector spares?
- Counters
→ Should be OK. - Drift chambers
- No spare exists so far (→ Liguang will look for them).
→ A plan to fix possible problems is necessary. - Fiber detector for ENGE
- Counters
- LCW → Steven's group will care.
- EPICS
- Beam momentum centroid etc.
- Possible risks and ways to mitigate damages.
- Beam commissioning
- Manpower
- Documents → A draft of each document needs to be developed.
- Radiation calculations will be done by Tokyo group by using FULKA and Geant4.