** Possible risks and ways to mitigate damages.
 
** Possible risks and ways to mitigate damages.
 
** Beam commissioning  
 
** Beam commissioning  
**  
+
** Manpower
<br> &rarr; We need discussion with Mark as soon as possible.
+
** Documents &rarr; A draft of each document needs to be developed.

Latest revision as of 09:30, 5 December 2024

Strategy Meeting (Hypernuclear Experiment)

Information

  • Time and Date: 22:00 on Dec 5, 2024
  • Participants: Joerg, Nue, Liguang, Pete, Sho, Guido, Toshi
  • Place: Zoom

Contents

ERR

  • The first ERR was done
  • Discussion for reactions to the ERR report
    • Radiation calculations will be done by Tokyo group by using FULKA and Geant4.
      → Sho installed FULKA in his laptop, and obtained a sample code for HKS from Pavel.
      → Sho will share the FULKA code with us, and Guido will work on it as well.
      → At first, we are going to ask Pavel to create the first code based on the latest design.
    • PCS
      • English documents are not fully ready or are not in hand of JLab (reviewer etc).
      • PCS test (+ existing power supplies) at JLab prior to the experiment
        → where/how/when/what to test?
    • Target
      • Possible dimension of CH2 will be clarified by us
      • Necessary targets are already shown in ERR
    • 48Ca has not purchased yet.
    • Detector spares?
      • Counters
        → Should be OK.
      • Drift chambers
        - No spare exists so far (→ Liguang will look for them).
        → A plan to fix possible problems is necessary.
      • Fiber detector for ENGE
    • LCW → Steven's group will care.
    • EPICS
      • Beam momentum centroid etc.
    • Possible risks and ways to mitigate damages.
    • Beam commissioning
    • Manpower
    • Documents → A draft of each document needs to be developed.