Difference between revisions of "Installation and Commissioning"
Jump to navigation
Jump to search
m (→Before Beam) |
m (→Before Beam) |
||
Line 6: | Line 6: | ||
=Before Beam= | =Before Beam= | ||
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]] | * Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]] | ||
− | |||
* [[ HRS Detector Checkout]] | * [[ HRS Detector Checkout]] | ||
− | |||
* [[ Beamline ]] | * [[ Beamline ]] | ||
− | |||
− | |||
* [[Spectrometer Angles ]] | * [[Spectrometer Angles ]] | ||
− | + | * [[Magnets]] | |
− | |||
− | * Magnets | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* DAQ | * DAQ | ||
** LHRS DAQ machine: adaq1 | ** LHRS DAQ machine: adaq1 |
Revision as of 18:24, 29 November 2017
Back to 2017 Fall Run Plan Back to Tritium-Main
Installation and Configuration
Before Beam
- Trigger Timing Checkout (placeholder slides)
- HRS Detector Checkout
- Beamline
- Spectrometer Angles
- Magnets
- DAQ
- LHRS DAQ machine: adaq1
- RHRS DAQ machine: adaq2
- Currently Functional online analysis machines: adaq3
- Keep only necessary CODA configurations
- Setup/Test remote power cycle of all crates
- Software
- Demonstrate/write-up new Strip Chart procedure
- Verify BTA functionality
- Demonstrate working Podd1.6, ROOT6, replay and online plots with cosmics
- Demonstrate updated spotL/spotR code (take special run with clock trigger and raster on)
- Demonstrate updated online liveTime calculations with cosmics/clock
With First Beam
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- BCM Calibration
- ARC Energy Measurement (parasitic only)
- Trigger Timing Checkout
- Detector Checkout with single foil, multi foils, and target cells
- VDC wire hits and efficiencies
- TDC distributions of scintillators, VDCs, and GC
- fastbus ADC distributions of scintillators, GC, and calorimeters
- FlashADC distributions of scintillators and GC
- Check all scalers
- check thresholds
- HRS Optics with saturated Q1 (LHRS p0>3 GeV, RHRS?)
- Multifoil target:
- one DIS run without sieve for y-target calibration
- sieve on, take a long DIS run for theta, phi calibration
- Hydrogen target: elastic peak check (move RHRS to a larger angle), and delta scan at +-2%, +-4% of elastic peak
- Multifoil target:
- Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell
- Detector Calibrations (in parallel with other activities once we have the electron data)
Optics commissioning runs
Target Boiling Study
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 mm | |||||
He3 | 5uA | 2x2 cm |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 mm | |||||
Carbon-Foil | 15uA | 2x2 mm | |||||
Carbon-Foil | 5uA | 2x2 mm |
Beam Energy Measurements
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |