* We can adapt the list tasks during the [https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning Spring 2018 run] | * We can adapt the list tasks during the [https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning Spring 2018 run] | ||
+ | [https://wiki.jlab.org/tegwiki/index.php/2018_Srping_Run <B>Back to 2018 Spring Run Plan</B>] | ||
+ | |||
+ | =[[Installation and Configuration]]= | ||
+ | |||
+ | =With First Beam (2019-09-04 - 2019-09-10)= | ||
+ | |||
+ | <ol> | ||
+ | |||
+ | <li> Beamline | ||
+ | <ol> | ||
+ | <li> [[Beam Centering]] | ||
+ | <li> [[Raster Size Calibration]] | ||
+ | <li> [[BPM Calibration]] (pedestal run, Bullseye scan) | ||
+ | <li> [[ARC Energy Measurement]] (parasitic only) | ||
+ | </ol> | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) | ||
+ | |||
+ | </ol> |
Revision as of 13:11, 8 August 2018
- We can adapt the list tasks during the Spring 2018 run
Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout
- Detector Checkout / Optics
- Detector Calibrations (in parallel with other activities once we have the electron data)