Difference between revisions of "Fall Installation and Commissioning"
Jump to navigation
Jump to search
m |
|||
Line 15: | Line 15: | ||
<li> [[Beam Centering]] | <li> [[Beam Centering]] | ||
<li> [[Raster Size Calibration]] | <li> [[Raster Size Calibration]] | ||
− | <li> [[BPM Calibration | + | <li> [Fall2018 BPM Calibration] [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration] (pedestal run, Bullseye scan) |
<li> [[ARC Energy Measurement]] (parasitic only) | <li> [[ARC Energy Measurement]] (parasitic only) | ||
</ol> | </ol> |
Revision as of 14:01, 21 September 2018
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
New Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering
- Raster Size Calibration
- [Fall2018 BPM Calibration] See Spring2018 BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout (regular)
- Detector Checkout / Optics (regular)
- Detector Calibrations (in parallel with other activities once we have the electron data) (regular)