Difference between revisions of "HYP SW Meeting 20241002"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
* document: https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit | * document: https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit | ||
==Decoder and analysis software== | ==Decoder and analysis software== | ||
− | * The code will be Hall A analyzer base | + | * The new analyzer code will be Hall A analyzer base |
− | * The old HKS analyzer written in FORTRAN → Toshi will try to find the code to share with Sanghwa. | + | * The old HKS analyzer written in FORTRAN may be a reference for some parts. → Toshi will try to find the code to share with Sanghwa. |
* ENGE spectrometer will be used for decay pion measurement: <br> → [https://researchmap.jp/gogami/presentations/47895839/attachment_file.pdf FB23_gogami_20240924.pdf] | * ENGE spectrometer will be used for decay pion measurement: <br> → [https://researchmap.jp/gogami/presentations/47895839/attachment_file.pdf FB23_gogami_20240924.pdf] | ||
+ | |||
==Timeline and manpower== | ==Timeline and manpower== | ||
* Sanghwa will evaluate tasks, necessary manpower, and timeline <br> based on readouts and the number of channels shown in the ERR document. | * Sanghwa will evaluate tasks, necessary manpower, and timeline <br> based on readouts and the number of channels shown in the ERR document. |
Revision as of 22:33, 1 October 2024
Software Meeting (Hypernuclear experiment at JLab)
- 09:00-09:30 on Oct 2nd, 2024 JST
- Participants: Sanghwa, Toshi
- Place: Zoom
Discussion
ERR
- Nov 18-19, 2024
- document: https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit
Decoder and analysis software
- The new analyzer code will be Hall A analyzer base
- The old HKS analyzer written in FORTRAN may be a reference for some parts. → Toshi will try to find the code to share with Sanghwa.
- ENGE spectrometer will be used for decay pion measurement:
→ FB23_gogami_20240924.pdf
Timeline and manpower
- Sanghwa will evaluate tasks, necessary manpower, and timeline
based on readouts and the number of channels shown in the ERR document. - Grad students, Teppi (Kyoto Univ.) and Tatsu (Tohoku Univ.), will go to JLab Oct-Nov.
→ They should be able to start the software work with Sanghwa;
e.g. repogitory preparation on Gitlab for Geant4 simulation, and analyzer preparation.