Line 21: Line 21:
 
** CH<sub>2</sub> target <br>&rarr; Detail needs to be determined. (need to be separate?)
 
** CH<sub>2</sub> target <br>&rarr; Detail needs to be determined. (need to be separate?)
 
*In addition to corrector magnet, steel shields are consider to be added on the beam line.
 
*In addition to corrector magnet, steel shields are consider to be added on the beam line.
* Were there shielding blocks for HES detectors at lower part of dipole magnet?
+
* Shielding blocks
 +
** No response from the vender
 +
** Were there shielding blocks for HES detectors at lower part of dipole magnet?
  
 
===Others===
 
===Others===

Revision as of 09:41, 16 October 2024

Strategy Meeting on Oct 16, 2024

Information

  • Time and Date: 22:00-23:00 on Oct 16, 2024 (JST)
  • Participants: Gudio, Nue, Pete, Joerg, Toshi
  • Place: Zoom

Content

ERR

  • Status of the document
    https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit?tab=t.0
  • Agenda
    https://hallcweb.jlab.org/wiki/index.php/ERR_Hypernuclear
  • Target (Liguang talked with Dave Meekins)
    • No manpower is available at the moment to initiate something.
    • (e,e'K+) target design should be straightforward.
    • α source mounting may be an issue to consider.
    • Liguang also talked with Radcon to proceed with buying the α source
    • Mixed α source (1 kBq for each)
      • The source may have a issue under low temperature.
      • Vacuum condition is OK.
    • 20 inch diameter for the scattering chamber.
    • CH2 target
      → Detail needs to be determined. (need to be separate?)
  • In addition to corrector magnet, steel shields are consider to be added on the beam line.
  • Shielding blocks
    • No response from the vender
    • Were there shielding blocks for HES detectors at lower part of dipole magnet?

Others

Next Meeting

  • 22:00 on Oct 16, 2024 (JST)