Difference between revisions of "Hyp-StraMeeting 20241023"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 14: Line 14:
 
** Signal connectors from the vacuum to outside <br> &rarr; Vacuum test is necessary.  
 
** Signal connectors from the vacuum to outside <br> &rarr; Vacuum test is necessary.  
 
** A sketch will be prepared
 
** A sketch will be prepared
** Scintillator fibers &rarr; MPPCs (+circuits) &rarr; VEM-EASIROC modules <br> &rarr; Is the VME-EASIROC OK for radiation level? ENGE is close to the target area, and the radiation may be high.
+
** Scintillator fibers &rarr; MPPCs (+circuits) &rarr; VEM-EASIROC modules <br> &rarr; <font color="red">Is the VME-EASIROC OK for radiation level? </font> ENGE is close to the target area, and the radiation may be high.
  
 
===Others===
 
===Others===

Revision as of 09:23, 23 October 2024

Strategy Meeting on Oct 23, 2024

Information

  • Time and Date: 22:00-23:00 on Oct 23, 2024 (JST)
  • Participants: Franco, Gudio, Nue, Pete, Sho, Bill, Joerg, Liguang, Toshi
  • Place: Zoom

Content

ERR

Others

Next Meeting

  • 22:00 on Oct X, 2024 (JST)



Back to Home