Difference between revisions of "Hyp-StraMeeting 20241205"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 14: Line 14:
 
*** PCS test (+ existing power supplies) at JLab prior to the experiment<br> &rarr; where/how/when/what to test?  
 
*** PCS test (+ existing power supplies) at JLab prior to the experiment<br> &rarr; where/how/when/what to test?  
 
** Target
 
** Target
*** Dimension of CH<sub>2</sub>
+
*** Possible dimension of CH<sub>2</sub> will be clarified by us
 +
*** Necessary targets are already shown in ERR
 +
** <sup>48</sup>Ca
 +
** Detector spares?
 +
***
 +
*** Drift chambers<br> - No spare exists so far (&rarr; Liguang to look for them). <br> &rarr; A plan to fix possible problems is necessary.
 
<br> &rarr; We need discussion with Mark as soon as possible.
 
<br> &rarr; We need discussion with Mark as soon as possible.

Revision as of 08:47, 5 December 2024

Strategy Meeting (Hypernuclear Experiment)

Information

  • Time and Date: 22:00 on Dec 5, 2024
  • Participants: Joerg, Nue, Liguang, Pete, Sho, Guido, Toshi
  • Place: Zoom

Contents

ERR

  • The first ERR was done
  • Discussion for reactions to the ERR report
    • Radiation calculations will be done by Tokyo group by using FULKA and Geant4.
      → Sho installed FULKA in his laptop, and obtained a sample code for HKS from Pavel.
      → Sho will share the FULKA code with us, and Guido will work on it as well.
      → At first, we are going to ask Pavel to create the first code based on the latest design.
    • PCS
      • English documents are not fully ready or are not in hand of JLab (reviewer etc).
      • PCS test (+ existing power supplies) at JLab prior to the experiment
        → where/how/when/what to test?
    • Target
      • Possible dimension of CH2 will be clarified by us
      • Necessary targets are already shown in ERR
    • 48Ca
    • Detector spares?
      • Drift chambers
        - No spare exists so far (→ Liguang to look for them).
        → A plan to fix possible problems is necessary.


→ We need discussion with Mark as soon as possible.