Difference between revisions of "Analysis Meeting: January 17th, 2017"
Jump to navigation
Jump to search
(Created page with "Back to Main Page >> [https://wiki.jlab.org/tegwiki/index.php/Main_Page#Analysis_Meetings Analysis Meetings] >> Pre-experiment<br> ==Instruct...") |
|||
Line 14: | Line 14: | ||
==Discussion== | ==Discussion== | ||
Discussion with Zhihong's slides | Discussion with Zhihong's slides | ||
− | * | + | *Raster- |
+ | -doug will get an update from Bill Gunning | ||
+ | -follow up with possible updates/repair to prevent frequent accesses during tritium running | ||
+ | |||
+ | *HRS- | ||
+ | --HRS momentum limitations-- | ||
+ | -priorities for Jack's time from now until running | ||
+ | -get update from Jack on current status/limitations on HRS magnets | ||
+ | -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit | ||
+ | |||
+ | --Cooling Co-dependence, tripping HRS magnets-- | ||
+ | -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?) | ||
+ | |||
+ | *DAQ- | ||
+ | -need to decide on final trigger settings for (e'p). (argon will use same trigger) | ||
+ | -students should get familiar with installed electronics, cable maps, etc. | ||
+ | -John will send out (e'p) trigger proposal next week | ||
+ | -parallel NIM and MLU trigger decisions, both sent to TS | ||
+ | |||
+ | *Scintillator- | ||
+ | --S0-- | ||
+ | -there wasn't an acceptance issue for GMp | ||
+ | -will the S0 frame generate too many pions? (for Marathon) | ||
+ | -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon |
Revision as of 16:28, 17 January 2017
Back to Main Page >> Analysis Meetings >> Pre-experiment
Instructions
Agenda
- Example (slides)
Attendance
Onsite: Phone:
Discussion
Discussion with Zhihong's slides
- Raster-
-doug will get an update from Bill Gunning -follow up with possible updates/repair to prevent frequent accesses during tritium running
- HRS-
--HRS momentum limitations-- -priorities for Jack's time from now until running -get update from Jack on current status/limitations on HRS magnets -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
--Cooling Co-dependence, tripping HRS magnets-- -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
- DAQ-
-need to decide on final trigger settings for (e'p). (argon will use same trigger) -students should get familiar with installed electronics, cable maps, etc. -John will send out (e'p) trigger proposal next week -parallel NIM and MLU trigger decisions, both sent to TS
- Scintillator-
--S0-- -there wasn't an acceptance issue for GMp -will the S0 frame generate too many pions? (for Marathon) -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon