Difference between revisions of "Analysis Meeting: January 17th, 2017"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 15: Line 15:
 
Discussion with Zhihong's slides
 
Discussion with Zhihong's slides
 
*Raster-
 
*Raster-
         -doug will get an update from Bill Gunning
+
         -Doug will get an update from Bill Gunning
 
         -follow up with possible updates/repair to prevent frequent accesses during tritium running
 
         -follow up with possible updates/repair to prevent frequent accesses during tritium running
  
 
*HRS-
 
*HRS-
         *HRS momentum limitations
+
         '''Bold textHRS momentum limitations'''
 
         -priorities for Jack's time from now until running
 
         -priorities for Jack's time from now until running
 
         -get update from Jack on current status/limitations on HRS magnets
 
         -get update from Jack on current status/limitations on HRS magnets
 
         -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
 
         -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
  
         *Cooling Co-dependence, tripping HRS magnets
+
         '''Cooling Co-dependence, tripping HRS magnets'''
 
         -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
 
         -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
  
Line 34: Line 34:
  
 
*Scintillator-
 
*Scintillator-
        *S0
+
      '''S0'''
 
         -there wasn't an acceptance issue for GMp
 
         -there wasn't an acceptance issue for GMp
 
         -will the S0 frame generate too many pions? (for Marathon)
 
         -will the S0 frame generate too many pions? (for Marathon)
 
         -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon
 
         -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon

Revision as of 17:30, 17 January 2017

Back to Main Page >> Analysis Meetings >> Pre-experiment

Instructions

Agenda


Attendance

Onsite: Phone:

Discussion

Discussion with Zhihong's slides

  • Raster-
       -Doug will get an update from Bill Gunning
       -follow up with possible updates/repair to prevent frequent accesses during tritium running
  • HRS-
       Bold textHRS momentum limitations
       -priorities for Jack's time from now until running
       -get update from Jack on current status/limitations on HRS magnets
       -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
       Cooling Co-dependence, tripping HRS magnets
       -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
  • DAQ-
       -need to decide on final trigger settings for (e'p). (argon will use same trigger)
       -students should get familiar with installed electronics, cable maps, etc.
       -John will send out (e'p) trigger proposal next week
       -parallel NIM and MLU trigger decisions, both sent to TS
  • Scintillator-
      S0
       -there wasn't an acceptance issue for GMp
       -will the S0 frame generate too many pions? (for Marathon)
       -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon