Difference between revisions of "Additional Installation and Commissioning"
Jump to navigation
Jump to search
(Created page with "[https://wiki.jlab.org/tegwiki/index.php/2018_Srping_Run <B>Back to 2018 Spring Run Plan</B>] [https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]") |
|||
Line 1: | Line 1: | ||
[https://wiki.jlab.org/tegwiki/index.php/2018_Srping_Run <B>Back to 2018 Spring Run Plan</B>] | [https://wiki.jlab.org/tegwiki/index.php/2018_Srping_Run <B>Back to 2018 Spring Run Plan</B>] | ||
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>] | [https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>] | ||
+ | |||
+ | =[[Installation and Configuration]]= | ||
+ | |||
+ | =With First Beam (12/04/2017 - 12/10/2017= | ||
+ | |||
+ | <ol> | ||
+ | |||
+ | <li> Beamline | ||
+ | <ol> | ||
+ | <li> [[Beam Centering]] | ||
+ | <li> [[Raster Size Calibration]] | ||
+ | <li> [[BPM Calibration]] (pedestal run, Bullseye scan) | ||
+ | <li> [[ARC Energy Measurement]] (parasitic only) | ||
+ | </ol> | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] | ||
+ | |||
+ | <li> [[Detector Checkout with single foil, multi foils, and target cells]] | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning HRS Optics Run] | ||
+ | |||
+ | <li> [[Target Boiling Study]] | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) | ||
+ | |||
+ | </ol> |
Revision as of 10:58, 11 January 2018
Back to 2018 Spring Run Plan Back to Tritium-Main
Installation and Configuration
With First Beam (12/04/2017 - 12/10/2017
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout
- Detector Checkout with single foil, multi foils, and target cells
- Optics commissioning HRS Optics Run
- Target Boiling Study
- Detector Calibrations (in parallel with other activities once we have the electron data)