(Created page with "[https://wiki.jlab.org/tegwiki/index.php/2018_Srping_Run <B>Back to 2018 Spring Run Plan</B>] [https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]")
 
Line 1: Line 1:
 
[https://wiki.jlab.org/tegwiki/index.php/2018_Srping_Run <B>Back to 2018 Spring Run Plan</B>]
 
[https://wiki.jlab.org/tegwiki/index.php/2018_Srping_Run <B>Back to 2018 Spring Run Plan</B>]
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
 +
 +
=[[Installation and Configuration]]=
 +
 +
=With First Beam (12/04/2017 - 12/10/2017=
 +
 +
<ol>
 +
 +
<li> Beamline
 +
<ol>
 +
  <li> [[Beam Centering]]
 +
  <li> [[Raster Size Calibration]]
 +
  <li> [[BPM Calibration]] (pedestal run, Bullseye scan)
 +
  <li> [[ARC Energy Measurement]] (parasitic only)
 +
</ol>
 +
 +
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout]
 +
 +
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
 +
 +
<li> [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning HRS Optics Run]
 +
 +
<li> [[Target Boiling Study]]
 +
 +
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data)
 +
 +
</ol>