Difference between revisions of "Additional Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
 
Line 19: Line 19:
  
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics]
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics]
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning HRS Optics Run]
 
  
 
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data)
 
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data)
  
 
</ol>
 
</ol>

Latest revision as of 20:41, 12 January 2018

Back to 2018 Spring Run Plan Back to Tritium-Main

Installation and Configuration

With First Beam (2018-01-11 - 2018-01-12)

  1. Beamline
    1. Beam Centering
    2. Raster Size Calibration
    3. BPM Calibration (pedestal run, Bullseye scan)
    4. ARC Energy Measurement (parasitic only)
  2. DAQ and Trigger Checkout
  3. Detector Checkout / Optics
  4. Detector Calibrations (in parallel with other activities once we have the electron data)