4:00PM Run Meeting, Counting house meeting room (200C)
 
4:00PM Run Meeting, Counting house meeting room (200C)
 +
 +
Summary of past 24h:
 +
 +
* Beam was away whole swing, and came back during the night at 1/3 of our requested intensity: => not much data throughout the night;
 +
* MCC setup a ''plan of attack'' to tackle the machine issues
 +
* => beam back at the very end of the day for Hall A and C, almost at nominal current
 +
* (albeit with some minor tuning still going on, at injector level, and beamline tuning going on for halls B and D).
  
 
Plan: take production data for kin15 and 16 (if beam)
 
Plan: take production data for kin15 and 16 (if beam)
 
There is not been much data throughout the night, and there is a lot to bet we will not get any beam today during the day shift.
 
We do have beam back now (albeit with some minor tuning still going on.
 
MCC also needs to accomodate Halls B and D, and hopefully we will be able to run smoothly over the weekend.
 
  
  

Latest revision as of 19:01, 16 February 2018

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

  • Beam was away whole swing, and came back during the night at 1/3 of our requested intensity: => not much data throughout the night;
  • MCC setup a plan of attack to tackle the machine issues
  • => beam back at the very end of the day for Hall A and C, almost at nominal current
  • (albeit with some minor tuning still going on, at injector level, and beamline tuning going on for halls B and D).

Plan: take production data for kin15 and 16 (if beam)


Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653