Difference between revisions of "Fall Installation and Commissioning"
Jump to navigation
Jump to search
m |
|||
Line 1: | Line 1: | ||
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>] | [https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>] | ||
+ | [https://wiki.jlab.org/tegwiki/index.php/2018_Fall_Run <B>Back to 2018 Fall Run Plan</B>] | ||
− | * We can | + | * We can link to the list tasks during the [https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning Spring 2018 run] |
− | + | * Create new Installation and Commissioning plan here. | |
=[[Installation and Configuration]]= | =[[Installation and Configuration]]= |
Revision as of 13:13, 8 August 2018
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout
- Detector Checkout / Optics
- Detector Calibrations (in parallel with other activities once we have the electron data)