Difference between revisions of "Fall Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
m
Line 5: Line 5:
 
* Create new Installation and Commissioning plan here.
 
* Create new Installation and Commissioning plan here.
  
=[[Installation and Configuration]]=
+
=[[New Installation and Configuration]]=
  
 
=With First Beam (2019-09-04 - 2019-09-10)=
 
=With First Beam (2019-09-04 - 2019-09-10)=

Revision as of 12:22, 13 August 2018

Back to Tritium-Main Back to 2018 Fall Run Plan

  • We can link to the list tasks during the Spring 2018 run
  • Create new Installation and Commissioning plan here.

New Installation and Configuration

With First Beam (2019-09-04 - 2019-09-10)

  1. Beamline
    1. Beam Centering
    2. Raster Size Calibration
    3. BPM Calibration (pedestal run, Bullseye scan)
    4. ARC Energy Measurement (parasitic only)
  2. DAQ and Trigger Checkout (regular)
    1. New DAQ and Trigger Checkout
  3. Detector Checkout / Optics (regular)
    1. New Detector Checkout
    2. New Optics Checkout
  4. Detector Calibrations (in parallel with other activities once we have the electron data) (regular)
    1. New Detector Calibration