Difference between revisions of "Fall Installation and Commissioning"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
<li> Beamline | <li> Beamline | ||
<ol> | <ol> | ||
− | <li> [[Beam Centering]] | + | <li> [[Beam Centering]] (standard) |
− | <li> [[Raster Size Calibration]] | + | <li> [[Raster Size Calibration]] (standard) |
+ | <li> [[ARC Energy Measurement]] (standard, parasitic only) | ||
<li> [[Fall2018 BPM Calibration]] [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration] (pedestal run, Bullseye scan) | <li> [[Fall2018 BPM Calibration]] [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration] (pedestal run, Bullseye scan) | ||
− | |||
</ol> | </ol> | ||
Revision as of 14:03, 21 September 2018
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
New Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering (standard)
- Raster Size Calibration (standard)
- ARC Energy Measurement (standard, parasitic only)
- Fall2018 BPM Calibration See Spring2018 BPM Calibration (pedestal run, Bullseye scan)
- DAQ and Trigger Checkout (regular)
- Detector Checkout / Optics (regular)
- Detector Calibrations (in parallel with other activities once we have the electron data) (regular)