Difference between revisions of "Fall-2018 Target Boiling Study"
Jump to navigation
Jump to search
m |
m |
||
Line 1: | Line 1: | ||
− | [https://wiki.jlab.org/tegwiki/index.php/ | + | [https://wiki.jlab.org/tegwiki/index.php/Fall_Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] |
* E0 = 4.22 GeV | * E0 = 4.22 GeV | ||
* HRS-L: Ep = 3.93 GeV/c, Theta = 17 Degrees | * HRS-L: Ep = 3.93 GeV/c, Theta = 17 Degrees |
Revision as of 14:12, 21 September 2018
Back to Installation and Commissioning
- E0 = 4.22 GeV
- HRS-L: Ep = 3.93 GeV/c, Theta = 17 Degrees
- HRS-R: Ep = 3.0 GeV/c, Theta = 24 Degrees
- Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
- Empty-Cell Target
Run number | Target | Beam Current | Comment |
Empty Cell | 22.5uA | 100K Events after cut |VZ|<7.5cm | |
Empty Cell | 5uA | 100K Events after cut |VZ|<7.5cm |
- For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run)
- H1 Target
Run number | Target | Beam Current | Comment |
H1 | 22.5uA | ||
H1 | 15uA | ||
H1 | 10uA | ||
H1 | 5uA | ||
H1 | 2.5uA |
- D2 Target
Run number | Target | Beam Current | Comment |
D2 | 22.5uA | ||
D2 | 15uA | ||
D2 | 10uA | ||
D2 | 5uA | ||
D2 | 2.5uA |
- H3 Target
Run number | Target | Beam Current | Comment |
H3 | 22.5uA | ||
H3 | 15uA | ||
H3 | 10uA | ||
H3 | 5uA | ||
H3 | 2.5uA | ||
H3 | 1uA |
- He3 Target
Run number | Target | Beam Current | Comment |
He3 | 22.5uA | ||
He3 | 15uA | ||
He3 | 10uA | ||
He3 | 5uA | ||
He3 | 2.5uA |
- C12 Target
Run number | Target | Beam Current | Comment |
C12 | 22.5uA | ||
C12 | 15uA | ||
C12 | 10uA | ||
C12 | 5uA | ||
C12 | 2.5uA |
- Dummy
Run number | Target | Beam Current | Comment |
Dummy | 24uA | ||
Dummy | 15uA | ||
Dummy | 10uA | ||
Dummy | 5uA | ||
Dummy | 2.5uA |