Difference between revisions of "Wiki-page for E12-11-112"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 29: Line 29:
 
# LQ2 cycle at 1600 A which is lower than the default setting for 3.82 and 3.93 GeV. Since this was how we set up magnets during optics run, live with it.
 
# LQ2 cycle at 1600 A which is lower than the default setting for 3.82 and 3.93 GeV. Since this was how we set up magnets during optics run, live with it.
 
# LHRS L1A signal is noisy but Trigger rate and ADC gate rate is good (https://logbooks.jlab.org/entry/3602167)
 
# LHRS L1A signal is noisy but Trigger rate and ADC gate rate is good (https://logbooks.jlab.org/entry/3602167)
*run 3581, 3852 have wrong Q1 current ( 882.8A instead of 875 A)
+
# run 3581, 3852 have wrong Q1 current ( 882.8A instead of 875 A)
  
 
== Spring 2018 ==
 
== Spring 2018 ==

Revision as of 17:27, 1 October 2018

Back to Tritium Run Group Tritium SQL Run-Info Web

Overview

E12-011-112 (x>1) at Hall A is proposed to precisely measure the isospin dependence of two-nucleon short range correlations using mirror nuclei 3H and 3He. More details can be found in the PAC38 Proposal and Patricia's web page.


Run Periods

Fall 2018

  • Beam energy: 5 pass for optics, 2 pass for production.
  • [Run plan]
  • Surveys:
Date LHRS RHRS
09.18.2018 17 degree 24 degree
  • Issues:
  1. BCM new receiver gain changed during optics run
  2. wierd BPM Y signal
  3. PS 25 and SH39 not connected until sept 30
  4. LQ2 cycle at 1600 A which is lower than the default setting for 3.82 and 3.93 GeV. Since this was how we set up magnets during optics run, live with it.
  5. LHRS L1A signal is noisy but Trigger rate and ADC gate rate is good (https://logbooks.jlab.org/entry/3602167)
  6. run 3581, 3852 have wrong Q1 current ( 882.8A instead of 875 A)

Spring 2018


December 2017

  • Beam Energy: 1 pass (2.216 GeV)
  • Targets: 3H, 3He, 2H, 1H
  • Run plan: spreadsheet

Calibration Runs

  • BPM
  • BCM
  • Optics
Run number Description
757, 758 LHRS BPM pedestal runs
90357, 90358 RHRS BPM pedestal runs
805 - 810 LHRS harp scan
90595- 90600 RHRS harp scan
814 - 819 LHRS BCM calibration
90604- 90608 RHRS BCM calibration

Production Runs

Run number Angle (degree) Momentum (GeV)
809 - 924 17 2.0
932 - 949 22 1.805


Meetings

Trigger configuration

  • All run were taken at single arm mode ( inclusive e' ).

LHRS (run number <20000):

T1:  S0 && S2
T2: (S0 && S2) && Cer
T3: (S0 || S2) && Cer

RHRS (run number >90000):

T4:  S0 && S2
T5: (S0 && S2) && Cer
T6: (S0 || S2) && Cer

How-to Documentation

Links