* Issues: | * Issues: | ||
# [https://logbooks.jlab.org/entry/3599360 BCM new receiver gain changed during optics run] | # [https://logbooks.jlab.org/entry/3599360 BCM new receiver gain changed during optics run] | ||
− | # [https://logbooks.jlab.org/entry/3600121 wierd BPM Y signal] | + | # [https://logbooks.jlab.org/entry/3600121 wierd BPM Y signal] ( seems not real, went away by itself ) |
# PS 25 and SH39 not connected until sept 30 | # PS 25 and SH39 not connected until sept 30 | ||
# LQ2 cycle at 1600 A which is lower than the default setting for 3.82 and 3.93 GeV. Since this was how we set up magnets during optics run, live with it. | # LQ2 cycle at 1600 A which is lower than the default setting for 3.82 and 3.93 GeV. Since this was how we set up magnets during optics run, live with it. | ||
− | # LHRS L1A signal is noisy but Trigger rate and ADC gate rate is good (https://logbooks.jlab.org/entry/3602167) | + | # LHRS L1A signal is noisy but Trigger rate and ADC gate rate is good (https://logbooks.jlab.org/entry/3602167), fixed during the Oct 9 hall access |
# run 3581, 3582 have wrong Q1 current ( 882.8A instead of 875 A) | # run 3581, 3582 have wrong Q1 current ( 882.8A instead of 875 A) | ||
+ | # suspicious hotspot on raster pattern ( hitting the collimator?) | ||
+ | # RHRS shower gate adjusted on Oct 09, need a new calibration | ||
== Spring 2018 == | == Spring 2018 == |
Revision as of 10:07, 10 October 2018
Back to Tritium Run Group Tritium SQL Run-Info Web
Overview
E12-011-112 (x>1) at Hall A is proposed to precisely measure the isospin dependence of two-nucleon short range correlations using mirror nuclei 3H and 3He. More details can be found in the PAC38 Proposal and Patricia's web page.
Run Periods
Fall 2018
- Beam energy: 5 pass for optics, 2 pass for production.
- [Run plan]
- Surveys:
Date | LHRS | RHRS |
---|---|---|
09.18.2018 | 17 degree | 24 degree |
- Issues:
- BCM new receiver gain changed during optics run
- wierd BPM Y signal ( seems not real, went away by itself )
- PS 25 and SH39 not connected until sept 30
- LQ2 cycle at 1600 A which is lower than the default setting for 3.82 and 3.93 GeV. Since this was how we set up magnets during optics run, live with it.
- LHRS L1A signal is noisy but Trigger rate and ADC gate rate is good (https://logbooks.jlab.org/entry/3602167), fixed during the Oct 9 hall access
- run 3581, 3582 have wrong Q1 current ( 882.8A instead of 875 A)
- suspicious hotspot on raster pattern ( hitting the collimator?)
- RHRS shower gate adjusted on Oct 09, need a new calibration
Spring 2018
- 2nd pass beam
- Spring run plan and summary spreadsheet
- LHRS sieve runs with 10.6 GeV beam run summary
December 2017
- Beam Energy: 1 pass (2.216 GeV)
- Targets: 3H, 3He, 2H, 1H
- Run plan: spreadsheet
Calibration Runs
- BPM
- BCM
- Optics
Run number | Description |
---|---|
757, 758 | LHRS BPM pedestal runs |
90357, 90358 | RHRS BPM pedestal runs |
805 - 810 | LHRS harp scan |
90595- 90600 | RHRS harp scan |
814 - 819 | LHRS BCM calibration |
90604- 90608 | RHRS BCM calibration |
Production Runs
Run number | Angle (degree) | Momentum (GeV) |
---|---|---|
809 - 924 | 17 | 2.0 |
932 - 949 | 22 | 1.805 |
Meetings
Trigger configuration
- All run were taken at single arm mode ( inclusive e' ).
LHRS (run number <20000):
T1: S0 && S2 T2: (S0 && S2) && Cer T3: (S0 || S2) && Cer
RHRS (run number >90000):
T4: S0 && S2 T5: (S0 && S2) && Cer T6: (S0 || S2) && Cer
How-to Documentation
- How to get most of the scientific software setup in your Jlab CUE
- Getting started with the Hall A analyzer
Links
- Tritium target wiki
- Hall A new logbook
- Hall A web page
- Tritium Collaboration wiki
- Analysis mailing list
- Tritium elog
- Run info from SQL database webpage