(Created page with "=Strategy Meeting= ==Info== * 21:00-22:00 on Feb 24, 2022 (JST) * * via Zoom ==Discussion== ===Possible time line=== * 2024-26? ===PAC presentation === * Do we need a pr...")
 
Line 16: Line 16:
 
===ERR===  
 
===ERR===  
 
*PCS
 
*PCS
 +
** The new magnet PCS has been arrived at JLab.
 
**  
 
**  
  
 
*Target  
 
*Target  
** 10 meetings with Dave were held since Dec 2020. <br> &rarr; We have consensus for the basic design. But, man power is needed for the detailed design. <br> 3 months design + 1 year construction.
+
** 10 meetings with Dave were held since Dec 2020. <br> &rarr; We have consensus for the basic design. But, man power is needed for the detailed design. <br> It would take for 3 months for design + 1 year for construction. <br> <font color="green">We would like to ask man power assignment at least for target design (+ safety assessment etc.) for ERR. <br>
 
** Gas + motion systems will be similar to those of PREX/CREX.  
 
** Gas + motion systems will be similar to those of PREX/CREX.  
 
** Dedicated scattering chamber is necessary  
 
** Dedicated scattering chamber is necessary  
** Target design is basically independent from experimental halls, A or C. <br> But, the cryogenic systems would be easier at Hall C.
+
** Target design is basically independent from experimental halls, A or C. <br> But, the cryogenic systems would be easier at Hall C.
 
 
 
 
  
 
==Report==
 
==Report==

Revision as of 08:03, 25 March 2022

Strategy Meeting

Info

  • 21:00-22:00 on Feb 24, 2022 (JST)
  • via Zoom


Discussion

Possible time line

  • 2024-26?

PAC presentation

  • Do we need a presentation?

ERR

  • PCS
    • The new magnet PCS has been arrived at JLab.
  • Target
    • 10 meetings with Dave were held since Dec 2020.
      → We have consensus for the basic design. But, man power is needed for the detailed design.
      It would take for 3 months for design + 1 year for construction.
      We would like to ask man power assignment at least for target design (+ safety assessment etc.) for ERR.
    • Gas + motion systems will be similar to those of PREX/CREX.
    • Dedicated scattering chamber is necessary
    • Target design is basically independent from experimental halls, A or C.
      But, the cryogenic systems would be easier at Hall C.