(Created page with "=Strategy Meeting= ==Info== * 21:00-22:00 on Feb 24, 2022 (JST) * * via Zoom ==Discussion== ===Possible time line=== * 2024-26? ===PAC presentation === * Do we need a pr...") |
(→ERR) |
||
Line 16: | Line 16: | ||
===ERR=== | ===ERR=== | ||
*PCS | *PCS | ||
+ | ** The new magnet PCS has been arrived at JLab. | ||
** | ** | ||
*Target | *Target | ||
− | ** 10 meetings with Dave were held since Dec 2020. <br> → We have consensus for the basic design. But, man power is needed for the detailed design. <br> 3 months design + 1 year construction. | + | ** 10 meetings with Dave were held since Dec 2020. <br> → We have consensus for the basic design. But, man power is needed for the detailed design. <br> It would take for 3 months for design + 1 year for construction. <br> <font color="green">We would like to ask man power assignment at least for target design (+ safety assessment etc.) for ERR. <br> |
** Gas + motion systems will be similar to those of PREX/CREX. | ** Gas + motion systems will be similar to those of PREX/CREX. | ||
** Dedicated scattering chamber is necessary | ** Dedicated scattering chamber is necessary | ||
− | ** Target design is basically independent from experimental halls, A or C. <br> But, the cryogenic systems would be easier at Hall C. | + | ** Target design is basically independent from experimental halls, A or C. <br> But, the cryogenic systems would be easier at Hall C. |
− | |||
− | |||
==Report== | ==Report== |
Revision as of 08:03, 25 March 2022
Strategy Meeting
Info
- 21:00-22:00 on Feb 24, 2022 (JST)
- via Zoom
Discussion
Possible time line
- 2024-26?
PAC presentation
- Do we need a presentation?
ERR
- PCS
- The new magnet PCS has been arrived at JLab.
- Target
- 10 meetings with Dave were held since Dec 2020.
→ We have consensus for the basic design. But, man power is needed for the detailed design.
It would take for 3 months for design + 1 year for construction.
We would like to ask man power assignment at least for target design (+ safety assessment etc.) for ERR. - Gas + motion systems will be similar to those of PREX/CREX.
- Dedicated scattering chamber is necessary
- Target design is basically independent from experimental halls, A or C.
But, the cryogenic systems would be easier at Hall C.
- 10 meetings with Dave were held since Dec 2020.
Report
- Okuyama's presentation file in a workshop HIEI2022 (Mar 22, 2022)
→ Geant4 simulation for the next experiment PDF
Next Meeting