Difference between revisions of "Hyp-StraMeeting 20220325"
Jump to navigation
Jump to search
(→ERR) |
(→ERR) |
||
Line 17: | Line 17: | ||
*PCS | *PCS | ||
** The new magnet PCS has been arrived at JLab last month. | ** The new magnet PCS has been arrived at JLab last month. | ||
− | ** | + | ** Sometime in this summer. |
*Target | *Target |
Revision as of 08:15, 25 March 2022
Strategy Meeting
Info
- 21:00-22:00 on Feb 24, 2022 (JST)
- via Zoom
Discussion
Possible time line
- 2024-26?
PAC presentation
- Do we need a presentation?
ERR
- PCS
- The new magnet PCS has been arrived at JLab last month.
- Sometime in this summer.
- Target
- 10 meetings with Dave were held since Dec 2020.
→ We have a consensus for the basic design.
→ But, man power is needed for the detailed design. - It would take for ~3 months for design + ~1 year for construction.
→ We would like to ask for man power assignment at least for target design (+ safety assessment etc.)
for ERR (Oct 2022 ~ in the beginning of 2023). - Gas + motion systems will be similar to those of PREX/CREX.
- Dedicated scattering chamber is necessary
- Target design is basically independent from experimental halls, A or C.
But, the cryogenic systems would be easier at Hall C.
- 10 meetings with Dave were held since Dec 2020.
Report
- Okuyama's presentation file in a workshop HIEI2022 (Mar 22, 2022)
→ Geant4 simulation for the next experiment PDF
Next Meeting