Difference between revisions of "Analysis Meeting: January 17th, 2017"
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
Discussion with Zhihong's slides | Discussion with Zhihong's slides | ||
*Raster- | *Raster- | ||
− | + | Doug will get an update from Bill Gunning | |
− | + | follow up with possible updates/repair to prevent frequent accesses during tritium running | |
*HRS- | *HRS- | ||
− | ''' | + | '''HRS momentum limitations''' |
− | + | priorities for Jack's time from now until running | |
− | + | get update from Jack on current status/limitations on HRS magnets | |
− | + | Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit | |
'''Cooling Co-dependence, tripping HRS magnets''' | '''Cooling Co-dependence, tripping HRS magnets''' | ||
− | + | for tritium running will cooling systems be pushed to the limit? (3-4 hall running?) | |
*DAQ- | *DAQ- | ||
− | + | need to decide on final trigger settings for (e'p). (argon will use same trigger) | |
− | + | students should get familiar with installed electronics, cable maps, etc. | |
− | + | John will send out (e'p) trigger proposal next week | |
− | + | parallel NIM and MLU trigger decisions, both sent to TS | |
*Scintillator- | *Scintillator- | ||
'''S0''' | '''S0''' | ||
− | + | there wasn't an acceptance issue for GMp | |
− | + | will the S0 frame generate too many pions? (for Marathon) | |
− | + | need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon |
Revision as of 16:31, 17 January 2017
Back to Main Page >> Analysis Meetings >> Pre-experiment
Instructions
Agenda
- Example (slides)
Attendance
Onsite: Phone:
Discussion
Discussion with Zhihong's slides
- Raster-
Doug will get an update from Bill Gunning follow up with possible updates/repair to prevent frequent accesses during tritium running
- HRS-
HRS momentum limitations priorities for Jack's time from now until running get update from Jack on current status/limitations on HRS magnets Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
Cooling Co-dependence, tripping HRS magnets for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
- DAQ-
need to decide on final trigger settings for (e'p). (argon will use same trigger) students should get familiar with installed electronics, cable maps, etc. John will send out (e'p) trigger proposal next week parallel NIM and MLU trigger decisions, both sent to TS
- Scintillator-
S0 there wasn't an acceptance issue for GMp will the S0 frame generate too many pions? (for Marathon) need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon