Discussion with Zhihong's slides
 
Discussion with Zhihong's slides
 
*Raster-
 
*Raster-
         -Doug will get an update from Bill Gunning
+
         Doug will get an update from Bill Gunning
         -follow up with possible updates/repair to prevent frequent accesses during tritium running
+
         follow up with possible updates/repair to prevent frequent accesses during tritium running
  
 
*HRS-
 
*HRS-
         '''Bold textHRS momentum limitations'''
+
         '''HRS momentum limitations'''
         -priorities for Jack's time from now until running
+
         priorities for Jack's time from now until running
         -get update from Jack on current status/limitations on HRS magnets
+
         get update from Jack on current status/limitations on HRS magnets
         -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
+
         Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
  
 
         '''Cooling Co-dependence, tripping HRS magnets'''
 
         '''Cooling Co-dependence, tripping HRS magnets'''
         -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
+
         for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
  
 
*DAQ-
 
*DAQ-
         -need to decide on final trigger settings for (e'p). (argon will use same trigger)
+
         need to decide on final trigger settings for (e'p). (argon will use same trigger)
         -students should get familiar with installed electronics, cable maps, etc.
+
         students should get familiar with installed electronics, cable maps, etc.
         -John will send out (e'p) trigger proposal next week
+
         John will send out (e'p) trigger proposal next week
         -parallel NIM and MLU trigger decisions, both sent to TS
+
         parallel NIM and MLU trigger decisions, both sent to TS
  
 
*Scintillator-
 
*Scintillator-
 
       '''S0'''
 
       '''S0'''
         -there wasn't an acceptance issue for GMp
+
         there wasn't an acceptance issue for GMp
         -will the S0 frame generate too many pions? (for Marathon)
+
         will the S0 frame generate too many pions? (for Marathon)
         -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon
+
         need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon

Revision as of 17:31, 17 January 2017

Back to Main Page >> Analysis Meetings >> Pre-experiment

Instructions

Agenda


Attendance

Onsite: Phone:

Discussion

Discussion with Zhihong's slides

  • Raster-
       Doug will get an update from Bill Gunning
       follow up with possible updates/repair to prevent frequent accesses during tritium running
  • HRS-
       HRS momentum limitations
       priorities for Jack's time from now until running
       get update from Jack on current status/limitations on HRS magnets
       Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
       Cooling Co-dependence, tripping HRS magnets
       for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
  • DAQ-
       need to decide on final trigger settings for (e'p). (argon will use same trigger)
       students should get familiar with installed electronics, cable maps, etc.
       John will send out (e'p) trigger proposal next week
       parallel NIM and MLU trigger decisions, both sent to TS
  • Scintillator-
      S0
       there wasn't an acceptance issue for GMp
       will the S0 frame generate too many pions? (for Marathon)
       need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon