Discussion with Zhihong's slides
 
Discussion with Zhihong's slides
 
*Raster-
 
*Raster-
         Doug will get an update from Bill Gunning
+
         -Doug will get an update from Bill Gunning
         follow up with possible updates/repair to prevent frequent accesses during tritium running
+
         -follow up with possible updates/repair to prevent frequent accesses during tritium running
  
 
*HRS-
 
*HRS-
 
         '''HRS momentum limitations'''
 
         '''HRS momentum limitations'''
         priorities for Jack's time from now until running
+
         -priorities for Jack's time from now until running
         get update from Jack on current status/limitations on HRS magnets
+
         -get update from Jack on current status/limitations on HRS magnets
         Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
+
         -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
  
 
         '''Cooling Co-dependence, tripping HRS magnets'''
 
         '''Cooling Co-dependence, tripping HRS magnets'''
         for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
+
         -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
  
 
*DAQ-
 
*DAQ-
         need to decide on final trigger settings for (e'p). (argon will use same trigger)
+
         -need to decide on final trigger settings for (e'p). (argon will use same trigger)
         students should get familiar with installed electronics, cable maps, etc.
+
         -students should get familiar with installed electronics, cable maps, etc.
         John will send out (e'p) trigger proposal next week
+
         -John will send out (e'p) trigger proposal next week
         parallel NIM and MLU trigger decisions, both sent to TS
+
         -parallel NIM and MLU trigger decisions, both sent to TS
  
 
*Scintillator-
 
*Scintillator-
 
       '''S0'''
 
       '''S0'''
         there wasn't an acceptance issue for GMp
+
         -there wasn't an acceptance issue for GMp
         will the S0 frame generate too many pions? (for Marathon)
+
         -will the S0 frame generate too many pions? (for Marathon)
         need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon
+
         -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon

Revision as of 17:31, 17 January 2017

Back to Main Page >> Analysis Meetings >> Pre-experiment

Instructions

Agenda


Attendance

Onsite: Phone:

Discussion

Discussion with Zhihong's slides

  • Raster-
       -Doug will get an update from Bill Gunning
       -follow up with possible updates/repair to prevent frequent accesses during tritium running
  • HRS-
       HRS momentum limitations
       -priorities for Jack's time from now until running
       -get update from Jack on current status/limitations on HRS magnets
       -Tentative Priorities: 1-stability of LHRS at high-momentum, 2-raise RHRS momentum limit
       Cooling Co-dependence, tripping HRS magnets
       -for tritium running will cooling systems be pushed to the limit? (3-4 hall running?)
  • DAQ-
       -need to decide on final trigger settings for (e'p). (argon will use same trigger)
       -students should get familiar with installed electronics, cable maps, etc.
       -John will send out (e'p) trigger proposal next week
       -parallel NIM and MLU trigger decisions, both sent to TS
  • Scintillator-
      S0
       -there wasn't an acceptance issue for GMp
       -will the S0 frame generate too many pions? (for Marathon)
       -need to look at DVCS data to see if there will be an issue for pion-rejection in Marathon